SeniorLiving Boston

Account Settings

Manage your notification preferences, privacy, language, and security settings.

Notification Preferences

Email Notifications

Receive updates about project milestones and system alerts.

SMS Alerts

Critical system alerts sent via text message.

Privacy & Language

Change Password

Our Project Milestones

Key events and achievements in our journey of delivering advanced medical infrastructure solutions.

2019

Company Foundation

SeniorLiving Boston was established as a technical consultancy, bridging Israeli innovation with American healthcare engineering standards for large-scale medical facilities.

2021

First Major Hospital HVAC Project

Successfully designed and optimized the HVAC and advanced HEPA filtration system for a 500-bed regional medical center, achieving full compliance with international standards.

2023

Integrated Medical Gas & Power Network

Commissioned a complete medical gas distribution and emergency power backup solution for a new surgical wing, ensuring 99.99% uptime and critical life support.

Recommended Solutions & Best Practices

Based on our extensive work with medical facilities, we recommend these core systems and approaches to ensure compliance, efficiency, and patient safety.

1

Advanced HEPA Filtration Systems

Implementing multi-stage HEPA filtration with UV-C disinfection is critical for infection control in surgical suites and isolation rooms. We recommend systems with real-time air quality monitoring.

  • Reduces airborne pathogens by 99.97%
  • Complies with ASHRAE Standard 170
  • Energy-recovery ventilators for efficiency
2

Medical Gas Pipeline Networks

A robust, zone-valved distribution system for oxygen, medical air, and vacuum is essential. We recommend copper piping with digital pressure monitoring and automatic backup source switching.

  • NFPA 99 & HTM 02-01 compliance
  • Redundant main lines for critical care
  • Centralized alarm panels
3

Tier-3 Emergency Power

For life support and critical equipment, we recommend N+1 redundant generator systems with automatic transfer switches and sufficient fuel storage for 96 hours of operation.

  • Seamless backup for ICU & OR
  • Parallel generator synchronization
  • Regular load-bank testing protocol

For a detailed assessment and implementation plan tailored to your facility, please contact our engineering team.